This development will consist of the importation and recovery through deposition of inert waste and material, namely soil and stones, for the restoration of the existing gravel pit, as well as use of the existing authorised site access and revised internal roadway, wheel bath, and associated civil works for a five year period. The area to be restored by this development is 2.0157 hectares, and the application area is entirely within the area authorised by 6754, QY20 and 1392
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Kilree , Bagenalstown , Co.Carlow
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
5% of nearby decided applications were refused. The preview found 284 nearby planning records within 5 km where a location match is available.
- Matched source
- 17308
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
To install 30 KW of roof mounted solar panels on existing roof of canopy attached to the shop front (area of solar panels 127.3 sq.m roof area 173 sq.m) and all associated site works
An extension to existing industrial unit and ancillary office accommodation, retention permission for existing dry store, along with concrete yards and all ancillary works
For a Medium Voltage (MV) Substation Buildings and all associated works to facilitate the development
The construction of a detached domestic garage and all associated site works
The construction of 4 No. industrial buildings accessed from the existing industrial park access road, comprising: Unit A (8,283m2) will consist of a single storey industrial unit with an attached two storey building consisting of ancillary toilets, canteen, locker room and offices; Unit B (8,584m2) will consist of a single storey industrial unit with an attached two storey building consisting of ancillary toilets, canteen, locker room and offices; Unit C (3,399m2) will consist of a single storey industrial unit with an attached two storey building consisting of ancillary toilets, canteen, locker room and offices; Unit D (3,594m2) will consist of a single storey industrial unit with ancillary toilets. Other works as part of the development include: new access road continuing from existing industrial park access road to serve the site; connection to existing services; landscaping; boundary treatment; and all associated works to facilitate the development. An Environmental Impact Report and A Natura Impact Statement are submitted with this application.
Source match
Matched from public planning record 17308The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report