An extension to existing building consisting of extending existing locker room and new goods inwards/storage area at ground floor level and extending existing office area at first floor level, together with all associated site works.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Royal Oak Industrial Estate , Royal Oak Road , Bagenalstown
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
5% of nearby decided applications were refused. The preview found 299 nearby planning records within 5 km where a location match is available.
- Matched source
- 17320
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
The construction of an onsite wastewater treatment system, consisting of wastewater pump station, over ground rising main, sludge tank, balance tank, aerobic digester, control room and all associated site works. Retention planning permission is sought for the erection of 2 No grain silos, 2 No gas silos and 4 No Multi-Purpose Vessels with all ancillary site works
For (a) the erection of 3 no. water tanks having maximum height of 12 meters above ground level. (b) the relocation of 2 no. existing grain silos and all associated site works
The installation of solar photovoltaic panels mounted to roof of existing portal frame building and all associated site works
The provision of internal first floor office space including the addition of first floor windows to the north and west elevations and all associated ancillary works
The construction of a portal frame storage unit with the installation of solar photovoltaic panels mounted to roof of same, with all associated ancillary site development works
Source match
Matched from public planning record 17320The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report