To construct a four bay double sheep shed with an underground slurry holding tank on one side of the shed, also construct a concrete silage slab and all associated site works
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Corlisbrattan , Arva , Co Cavan
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
6% of nearby decided applications were refused. The preview found 100 nearby planning records within 5 km where a location match is available.
- Matched source
- 17526
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
To construct (1) A four bay extension to the existing shed which will consits of slatted area with slurry holding tank and dry bedded pens. (2) Livestock concrete handling areas (3) Farm roadways and all associated site works
To erect fully serviced two storey extension to rear of existing uninhabitable dwelling, porch, alterations to elevations, relocation of existing entrance, upgrade of sewerage treatment facilities and all ancillary works. Significant further information and revised plans have been received
For (A) A new 2 storey dwelling with (B) a domestic garage. Installation of (C) new wastewater treatment system. Complete with any other site works as required
For (A) a new 2 storey dwelling with (B) a domestic garage. Installation of (C) new wastewater treatment system. Complete with any other site works as required
To erect new dwelling house, domestic garage, entrance, boundary walls, piers with sewerage treatment system & percolation area
Source match
Matched from public planning record 17526The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report