The construction of communications infrastructure comprising of a 30 metre lattice tower, associated equipment, cabinets, cabin, fencing, use of existing access and extension of access track. Significant further information and revised plans have been received
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Drummanduff , New Inn , Co Cavan
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
6% of nearby decided applications were refused. The preview found 174 nearby planning records within 5 km where a location match is available.
- Matched source
- 17531
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
For alterations to an existing cottage to include a single storey extension to the rear and side, elevational changes, raising the roof height to provide first floor accommodation, new access lane to replace an existing lane which will be closed up, entrance gates and piers, waste-water treatment plant with percolation area and all associated site works
For the demolition of an existing dwelling and the construction of a part single storey, part two storey detached replacement dwelling. The application also includes a new access lane to replace an existing lane which will be closed up, entrance gates and piers, waste-water treatment plant with percolation area and all associated site works
To retain (1) existing storage shed extension to the north east of existing pig unit complex, (2) 2 no mobile home units to north east boundary of the site, (3) amended site layout plan to include for amended site boundary, and (4) PERMISSION to complete associated and ancillary site works. This application relates to a development, which is for the purposes of an activity requiring a licence under Part IV of the Environmental Protection Agency (Licensing) Regulations 1994 to 2013
For dwelling house comprising part two storey, part single storey, detached domestic garage, effluent treatment system, percolation and alterations to existing access
RETAIN works and complete works carried out for development to include: (1) the removal of the existing rear pitched roof and the construction of a new first floor rear extension with a new pitched roof over the existing dwelling and new first floor extension, including build up gable walls to u/side of new roof. The new pitched roof ridge level (over existing dwelling and new extension) is 1.59M higher than the existing pitched roof ridge level. When completed the existing dwelling and extension will become a 4-bedroom dwelling, the existing dwelling is currently 2-bedrooms (2) the construction of a 2-storey pitched roof front extension to the existing dwelling (3) and all necessary ancillary site development works to facilitate this development. PLANNING PERMISSION is sought for (4) decommission existing septic tank and install a new wastewater treatment system and percolation area
Source match
Matched from public planning record 17531The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report