Section 42 - extension of appropriate period - 16/176 - 10 year permission for the construction of a Solar PV Energy development within a total site area of up to 13.76 ha to include one single storey electrical substation building, electrical transformer / inverter station modules, solar PV panels ground mounted on steel support structures, access roads, fencing and associated electrical cabling, ducting and ancillary infrastructure
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Ballycooleen , Avoca , Co. Wicklow
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
11% of nearby decided applications were refused. The preview found 296 nearby planning records within 5 km where a location match is available.
- Matched source
- 2660
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
Proposed dwelling, waste water treatment system to EPA standards, garage, entrance and associated works
1) a single-storey sunroom extension to the north west elevation of the existing dwelling and 2) a domestic storage shed along with all associated site development works
Demolish a 29 sqm extension to the side of the existing dwelling along with a 56 sqm outbuilding and erect a 122m extension to the side of the existing 55 sqm original dwelling, block up the existing vehicular entrance and construct a new vehicular entrance with improved sightlines along with all associated site development works
The importation of material to in-fill and re-contour the subject site. Once the importation is complete, the applicant will seed the land in line with Teagasc guidelines and return it to agricultural use. The Operational Phase will see the Site being used as agricultural pastureland. The applicant proposes, subject to planning, to import clean greenfield soil and stone to remediate approximately 2.43ha of the total site. The 2.43ha. is divided into 3 distinct phases - Phase 1 is 0.78ha, Phase 2 is 0.77ha and Phase 3 is 0.88ha. A fill plan has been drawn up for the importation of 18,200tonnes to fill Phase 1, 23,085tonnes to fill Phase 2, and 42,721tonnes to fill Phase 3, equating to a total of 84,006tonnes of soil and stone. Permission is being sought for a 5-year period and will be subject to a waste facility permit
Agricultural slatted unit shed along with associated site development works
Source match
Matched from public planning record 2660The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report