To construct a new dwelling house, detached home office building, wastewater treatment system, percolation area, well and all ancillary site works
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Culleen , Tubber , Co. Clare
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
4% of nearby decided applications were refused. The preview found 51 nearby planning records within 5 km where a location match is available.
- Matched source
- 18701
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
The development consists of the construction of a slatted unit and associated site works
Of the site entrance and internal parking area along with associated site works
The development will consist of construction of an extension and modifications to existing dwelling house with all associated works, using existing connections to wastewater system, bored well, and existing entrance from public road
For the construction of a dwelling house, garage, treatment unit and all associated site works. A Natura Impact Statement will be submitted to the Planning Authority with the planning application
To construct a dwelling house with a wastewater treatment plant, percolation area, removal of the partially demolished foundations and remaining debris of demolished house, which was previously granted under Planning Reference No 98/1044, reuse of previous site entrance location of Planning Reference No 98/1044 and all associated site works. The application includes a Natura Impact Statement Report. Gross floor space of proposed works: Dwelling House = 153.75m².
Source match
Matched from public planning record 18701The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report