Construct livestock underpass, effluent holding tank and all associated site works
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Leiter , Kingscourt , Co Cavan
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
7% of nearby decided applications were refused. The preview found 229 nearby planning records within 5 km where a location match is available.
- Matched source
- 19128
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
For construction of a livestock underpass, effluent holding tank, a new agricultural entrance and all associated site works
Retention of the partly constructed dwelling, retention of the domestic garage foundations and floor slab, retention of the wastewater treatment system and percolation area, retention of entrance driveway to site; all of which received planning permission under Pl Ref: 06/337, along with seeking PERMISSION to complete the dwelling and all associated works in their entirety as per the plans submitted
For the construction of extensions to the existing single storey cottage comprising of a living/dining space, bedroom, WC and the conversion of existing shed structure for use as a bedroom. - Demolitions of existing single storey extension and ancillary structures - Proposed new extension to existing dwelling. Approx. 69m sq - Conversion of existing ancillary structure - Alterations to existing roof structures - Associated site works including levelling of existing garden and driveway
To construct single storey detached dwelling, with single storey detached domestic garage, new vehicular entrance onto public road, driveway, waste water treatment system and percolation area, landscaping, boundaries and associated site works
For development consisting of (1) to demolish out buildings attached to existing dwelling, (2) demolish part of existing dwelling to include front porch, (3) make amendments to internal layout of existing dwelling, (4) to construct a storey and a half type extension to side and front of existing dwelling, (5) to construct new porch, (6) to close up and decommission an existing septic tank and soak-pit and to install a proprietary waste water treatment unit and percolation area and (7) all associated ancillary site development works
Source match
Matched from public planning record 19128The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report