The construction of a commercial/light industrial portal frame structure with ancillary office accommodation, replacement of existing site entrance, new entrances and perimeter boundary treatments including new subdivision boundary, additional parking facilities, and associated services and site works
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Wexford Road Business Park , Staplestown , Co. Carlow
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
10% of nearby decided applications were refused. The preview found 712 nearby planning records within 5 km where a location match is available.
- Matched source
- 19159
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
The construction of a commercial/light industrial portal frame structure with ancillary office accommodation, replacement of existing site entrance, new entrances and perimeter boundary treatments including new subdivision boundary, additional parking facilities, and associated services and site works
Alterations to existing light industrial and associated office space unit as granted under Pl Ref. 04/897, to carry out internal changes comprising of a first floor area and full planning permission to carry out elevation alterations to accommodate same
For a 36m lattice support structure carrying a 0.6m link dish, training equipment and support steelwork together with equipment cabinet and associated equipment within a fenced compound at Unit 5, Wexford Road Business Park, Staplestown, Co. Carlow. The development will be used to facilitate line of sight communications to an existing factory and to provide high speed wi-fi communications. This structure will be used by Delmec Engineering Limited as a National Training Facility that will provide their engineers with advanced training procedures in climbing at height, rescue climbing, equipment installation, structure surveying and analysis and safety inspections. This structure will also be used as a product display model demonstrating new procedures and technologies to international clients.
To construct a single storey industrial unit with offices and workshop (on previously granted fully serviced site, planning ref 04/467), associated parking and hardstand area, front and rear entrance, perimeter fencing and wall, connection to all existing services onsite and associated site works
The construction of extension to the existing industrial unit and all ancillary site development works
Source match
Matched from public planning record 19159The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report