Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

Tievenanass , Mountain Lodge , Co Cavan

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

4% of nearby decided applications were refused. The preview found 139 nearby planning records within 5 km where a location match is available.

Matched source
19479
Project type
One-off house
Coverage
5 km radius
139Nearby applications
4%Refused
134Conditional grants
0Refusal reasons

Top refusal reasons nearby

No reasons on record yet

More refusal reasons are being processed from public planning records.

Nearest similar decisions

21251

For a 10 year permission for the erection of a single wind turbine with a maximum height of up to 125 metres and all associated site development, access and reinstatement works; including turbine foundation, hardstanding area, site access track, 1 no. site entrance, electrical switchroom and underground electrical cabling. The proposed development will have a 30-year operational life from the date of commissioning of the wind turbine

Granted0.0 km21 September 2021
19479

For a ten year permission for the erection of a single wind turbine with a maximum height of up to 125 metres and all associated site development, access and reinstatement works; including turbine foundation, hardstanding area, site access track, 1 no. site entrance, electrical switchroom and underground electrical cabling. The proposed development will have a 30-year operational life from the date of commissioning of the wind turbine. Significant further information and revised plans have been submitted

Refused0.0 km27 January 2021
2360331

To construct a new two-storey dwelling house with detached domestic garage, form new vehicular site entrance onto public roadway, installation of approved proprietary wastewater treatment system & percolation area, together with all associated site development works

Refused0.8 km22 February 2024
2460549

To construct a new dormer style dwelling house with detached domestic garage, form new vehicular site entrance onto public roadway, installation of approved proprietary wastewater treatment system & percolation area, together with all associated site development works

Granted0.8 km19 December 2024
2255

To erect fully serviced part single storey, part storey and half type dwelling, convert existing derelict building into domestic garage & store, upgrade existing entrance, new sewerage treatment facilities & all ancillary works

Granted0.9 km11 April 2022
17497

To construct a slatted house with underground slurry storage tanks and all ancillary site works. Significant further information and revised plans have been submitted

Granted0.9 km10 April 2018

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required