Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

Kilcandra , Glenealy , Co. Wicklow

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

18% of nearby decided applications were refused. The preview found 429 nearby planning records within 5 km where a location match is available.

Matched source
19624
Project type
One-off house
Coverage
5 km radius
429Nearby applications
18%Refused
351Conditional grants
1Refusal reasons

Top refusal reasons nearby

Rural Housing Need1

Nearest similar decisions

19624

28.1 sqm single storey extension to the side of existing dwelling and associated works

Granted0.0 km23 September 2019
2560886

Demolition of existing extension to rear of existing dwelling, construction of new rear extension and associate works

Granted0.0 km18 December 2025
21859

New domestic garage and associate works

Granted0.1 km03 September 2021
19591

Demolish existing semi derelict agricultural shed and permission to construct slatted cattle shed, concrete aprons and all associated site works

Granted0.5 km18 July 2019
2560764

RED III Category 3 Development - Construction of a solar PV energy development with an operational life of 40 years on three land parcels totalling approximately 203.5 hectares comprising the installation of approximately 806,630 sq. m. of photovoltaic panels on ground mounted frames and associated ancillary development including: 23 no. transformers stations, 2 no. Ring Main Unit buildings, string-inverters attached to panel frames, CCTV security cameras mounted on 4 metre high poles, deer-proof perimeter security fencing (2 metres high) raised 150mm to allow for the movement of small mammals, 3 no. site entrances utilising existing entrances including upgrade to entrance on L1111 to facilitate construction and operational phase access, internal access tracks between the solar arrays and the site entrances, 2 no. clear span bridges over existing watercourses, 1 no. primary temporary construction compound and 2 no. satellite temporary construction compounds, all associated ancillary development works including landscaping; and the installation of a total of ca. 6.1 kilometres of 33Kv double circuit underground cable, of which ca. 2.4 kilometres will be beneath public (L1111, L1113, L5113, L51132 and L5112) and private roads in an excavated trench including underground ducting and joint bays and all associated site development and reinstatement works to connect the proposed Ring Main Units on two of the land parcels of the solar PV energy development and extending to the site of a proposed 110kv substation to be the subject of a separate planning permission under the Planning and Development (Strategic Infrastructure) Act 2006.

Granted0.6 km19 December 2025
2021

Extend the appropriate period of a permission - 01/5285 - Engineered Residual Landfill (31 hectares) to accept 180,000 tonnes per annum of non hazardous waste for 15 years and ancillary facilities

Granted0.7 km25 February 2020

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required