Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

Glenmore , Kilmihil , Co Clare

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

3% of nearby decided applications were refused. The preview found 29 nearby planning records within 5 km where a location match is available.

Matched source
19868
Project type
One-off house
Coverage
5 km radius
29Nearby applications
3%Refused
28Conditional grants
0Refusal reasons

Top refusal reasons nearby

No reasons on record yet

More refusal reasons are being processed from public planning records.

Nearest similar decisions

19868

For the erection of a permanent health and safety sign including all ancillary site works at the entrance to Glenmore Wind Farm

Granted0.0 km16 December 2019
19299

For the construction of a battery storage compound adjacent to an existing electricity substation, with new palisade fencing, bunded concrete plinths, up to 4 No. storage units and associated equipment, transformers and all ancillary site works. A Natura Impact Statement ( NIS ) has been prepared and included as part of this application

Granted0.1 km09 September 2019
22927

To construct a new dwelling house with private garage, site entrance, on-site wastewater treatment system and all other associated site works

Granted0.4 km23 March 2023
17703

For the development of a quarry and all associated site development and infrastructure works and services ( including site office, staff welfare facilities, site boundary treatment, landscaping and site reinstatement ) on a site measuring approximately 1 hectare in the Townland of Glenmore, Kilmihil, Co. Clare. The proposed quarry will have an operational period of ten years after which the site will be reinstated

Granted0.6 km15 February 2018
18555

For development which will consist of the installation of battery arrays located within container units (18 number units, each 30m2 by c. 2.6m tall) a control building (c 160.5m2 by c.6.4m tall) and transformer (c. 5m tall). The development will include for ancillary infrastructure including security fencing, lighting, CCTV, Internal access roads & drainage. The overall development site is c.1.4Ha.

Granted2.0 km30 August 2018
2360414

For development which will consist of a 10 year planning permission for the construction and operation of battery arrays (240 number units, each 1.87m2 by c. 2.32m tall), a control building with gross floor area 140m2 by 6.40m tall, 3 number 12MVA transformers (c. 3.5m tall), 1 number 2.5MVA transformer (c. 2.5m tall) and inverters (24 number units, each 1.85m2 by c. 2.22m tall. The development will include for ancillary infrastructure including security fencing, lighting, CCTV, internal access roads and drainage. The development will have a 35 year operational lifetime. The overall development site is ca. 1.42 hectares (ha)

Granted2.0 km23 November 2023

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF