Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

Killinure , Coolkenno , Tullow

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

12% of nearby decided applications were refused. The preview found 116 nearby planning records within 5 km where a location match is available.

Matched source
2010
Project type
One-off house
Coverage
5 km radius
116Nearby applications
12%Refused
102Conditional grants
2Refusal reasons

Top refusal reasons nearby

Ecology1
Other1

Nearest similar decisions

2010

Vegetable store and polytunnels, proposed new entrance, gravelled yard and all associated site works

Granted0.0 km09 November 2020
20634

To construct a dwelling house with services, domestic garage and all associated site works

Granted0.2 km13 November 2020
1824

The demolishment of an existing 17 square metre single storey extension and for permission for the construction of a 169 square metre two storey extension to the rear of our residence and the installation of a new wastewater treatment system on site

Granted1.1 km09 May 2018
191319

Change of use of part of community hall (meeting room) to preschool facilities

Granted1.1 km05 February 2020
2560916

Construction of a new dwelling, garage, wastewater treatment unit and polishing filter, new well, upgrade existing entrance onto public road and associate works

Granted1.3 km27 February 2026
2560119

Construct a single storey dwelling, garage, on site wastewater treatment system, percolation area, bored well, new domestic splayed entrance and driveway and all associated site development works

Granted1.3 km12 May 2025

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required