Construction of 2 new dwellings, works will include the closure of the existing vehicular entrance on the R761 and the provision of a new entrance onto The Grove to access the proposed development, upgrade works to the junction of The Grove and R761 to include for the provision of improved sight lines and a pedestrian footpath, connection to public services to replace existing off-site septic tank, together with all associated site works
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Bridge House , The Grove , Greystones
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
16% of nearby decided applications were refused. The preview found 1,878 nearby planning records within 5 km where a location match is available.
- Matched source
- 20552
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Changes to the development previously granted planning permission under Planning No. 20/552 which include the following, a) changes to the site boundaries, b) construction of a retaining wall to the Northern boundary, c) changes to the floor and roof level of the dwellings and d) all ancillary site works
Retention of single storey extensions area 103sqm to original 2 storey semi-detached dwelling
The removal of the modern conservatory to the side at first floor level, the demolition of the old extension to the side at ground floor level and the construction of a two-storey extension to the side including external access staircase and balcony, solar panels to the concealed valley on the roof and all ancillary works. This is a protected structure
Construction of 2 new dwellings. Works will include widening existing entrance on to the Grove, forming a new internal access road serving the existing dwelling and proposed 2 new dwellings, removal of existing sheds and garden structures, connection to mains services and all associated site works
Extend the appropriate period of 15/728 - importation of soil to alter existing field levels to facilitate the improving of agricultural land and provide for good agricultural practices and farming of the lands. This will also include the improvements to drainage together with all ancillary site works
Source match
Matched from public planning record 20552The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report