Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

Suite 16 Parklands Office Park , Southern Cross Road , Bray

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

16% of nearby decided applications were refused. The preview found 1,939 nearby planning records within 5 km where a location match is available.

Matched source
2093
Project type
One-off house
Coverage
5 km radius
1,939Nearby applications
16%Refused
1,623Conditional grants
2Refusal reasons

Top refusal reasons nearby

Other1
Zoning Contravention1

Nearest similar decisions

2093

Change of use from offices to pilates and physiotherapy

Granted0.0 km21 December 2020
181181

The proposal is for the construction of a first phase of development consisting of the following: A four storey nursing home building, accommodating 205 no. bedrooms, ancillary resident and staff facilities, and a plant area at roof level, with a total GFA of 10,440sqm, over a single level basement with a GFA of 2,228sqm, which includes plant, storage and car and cycle spaces. The proposals includes internal courtyards and terrace areas, and adjacent landscaped amenity space. A four storey office building, including a ground floor café (GFA of 175sqm) and plant area at roof level, with a total GFA of 2,857sqm. Internal access roads, and parking comprising 107 no. surface car parking spaces, 38 no. basement car parking spaces, 5 no. motorcycle spaces and 141 no. cycle spaces. Vehicular access will be via the existing entrance from Vevay Road. An ESB substation, all associated site and infrastructural works, including removal of existing hard surfacing, public lighting, landscaping and boundary treatments, foul and surface water drainage, including attenuation tanks, all on a site area of c. 1.66ha

Granted0.1 km15 April 2019
2460560

The removal of an existing pump house comprising of one 20 foot shipping container, and replacement with a like for like pump house in new 20 foot shipping container in adjacent location, and associated site works

Granted0.2 km22 October 2024
211501

For Phase 2 of a 2-phase housing development and will consist of: (A) The construction of 34 no. dwellings comprising 12 no. 2 bedroom 2 storey townhouses, 14 no. 3 bedroom 2 storey townhouses, and 8 no. 3 bedroom 2 storey semi-detached houses; (B) All ancillary development works including footpaths, landscaping boundary treatments, public, private open space areas, car and bicycle parking, single storey ESB substations/bicycle stores, regarding/re-profiling of site where required and all ancillary site development/construction works (and all new site services connections); (C) Vehicular access will be from the Southern Cross Road (R768) via the existing entrance serving Kilruddery House & Gardens & Parklands Office Park. The works will entail the taking-down, relocation and reconfiguration of the existing Kilruddery entrance gates and piers (a protected structure) further within Kilruddery House & Gardens, with new access to the proposed residential development via new overall revised entrance arrangement (including to existing dwelling) and access route. It is also proposed to provide pedestrian access to north and pedestrian access to eastern boundary (from R761); the proposed development will allow for all roads, services and landscaping for Phase 1 and Phase 2 sites;

Granted0.2 km01 June 2022
22823

The construction of a first phase of development on the overall landholding consisting of the following: a) A three storey Nursing Home building, accommodating 144 no. bedrooms and ancillary resident and staff facilities, with a total GFA of 8,666sq.m. The proposal includes PV panels and a plant area at roof level, two signage zones, internal courtyards and terrace areas, an adjacent landscaped amenity space and a service yard area; b) A part three and part four storey office building, including plant area at roof level, with a total GFA of 3,354sq.m.; c) Internal access roads and parking, comprising 121 no. surface car parking spaces and 115 no. cycle spaces to serve both uses. Vehicular access will be via the existing entrance from Vevay Road; d) An ESB substation, all associated site and infrastructural works, including removal of existing hard surfacing, public lighting, landscaping and boundary treatments, bin storage, foul and surface water drainage, including attenuation tanks, all on a site area of c. 1.66 ha. The proposals will supersede the development permitted under WCC Reg. Ref. 18/1181 / ABP Ref. 304425-19

Granted0.2 km16 September 2022
211453

The proposal is for Phase 1 of a 2-phase housing development and will consist of: A) The construction of 96 no. dwellings (and single storey crèche c. 175 sq. m.) comprising 10 no. 2 bedroom 2 storey houses, 65 no. 3 bedroom 2 storey houses, 1 no. 4 bedroom detached house (3 storey to front 2 storey to rear), 6 no. 3 bedroom ‘Courtyard’ dwellings (2 storey), and 11 no. part 2 storey/3 storey 4 bedroom ‘Courtyard’ dwelling, 3 no. 1 bedroom apartments in 1 no. 3 storey building; B) All ancillary development works including footpaths, landscaping boundary treatments, public, private and communal open space areas (including balcony or terrace), car and bicycle parking, single storey ESB substations/bicycle stores regrading/re-profiling of site where required and all ancillary site development/construction works (and all new site services connections); C) Vehicular access will be from the Southern Cross Road (R768) via the existing entrance serving Kilruddery House & Gardens & Parklands Office Park. The works will entail the talking-down, relocation and reconfiguration of the existing Kilruddery entrance gates and piers (a protected structure) further within Kilruddery House & Gardens, with new access to the proposed residential development via new overall revised entrance arrangement (including to existing dwelling) and access route. It is also proposed to provide pedestrian access to the north and pedestrian access to eastern boundary (from R761); the proposed development will allow for all roads, services and landscaping for Phase 1 and Phase 2 sites;

Granted0.2 km15 June 2022

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required