Permission for development which will consist of an upgrade to the existing Bagenalstown Wastewater Treatment Plant (WwTP) to facilitate an increased treatment capacity. The proposed development will include (1) minor works to the existing inlet works, sludge dewatering building, Picket Fence Thickener, and administration building & control room; (2) change of use to 1 no. clarifier tank to a storm holding tank and minor works to same, as well as minor works to the existing storm holding tank and minor works to same, as well as minor works to the existing storm holding tank; (3) 1 no. aerobic reactor and 4 no. air blowers; (4) 1 no. flow diversion chamber and minor works to an existing flow diversion chamber; (5) 1 no. ferric sulphate storage tank with integrated bund and 2 no. chemical dosing pumps; (6) 1 no. MLSS distribution chamber (7) 1 no. RAS/WAS Pumping Station and 2 No. (each) RAS/WAS Pumping Station and 2 No. (each) RAS/WAS pumps (8) 2 no. final clarifier tanks; (9) 1 no. final effluent chamber (10) treated effluent flow meter & bypass (11) standby generator and (12) all ancillary works including pipework, pumps, landscaping and all associated site development and site excavation works above and below ground. A Natura Impact Statement will be submitted to the Planning Authority with the application.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Long Range Road , Moneybeg , Bagenalstown
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
5% of nearby decided applications were refused. The preview found 300 nearby planning records within 5 km where a location match is available.
- Matched source
- 21203
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
The construction of a Detached Two-Storey Dwelling, connection to mains water & sewerage and all associated site development works
For the demolition of existing derelict dwelling and the construction of 4 number two storey terraced dwellings with connection to existing on site services with all ancillary site works. This planning application shall include a Natura Impact Statement (NIS).
Construction of 19 number two storey dwellings, connection to and completion of existing on site services, access road and footpaths with all ancillary site works. The planning applications shall include a Site Specific Flood Risk Assessment and Natura Impact Statement (NIS)
(1) the phased demolition of existing school buildings, including the phased decommissioning and removal of existing temporary school accommodation units, (2) the phased construction of a new 1- and 2-storey school building, to cater for a total of 750 no. pupils, with a total gross internal floor area of 7,752m2, incorporating 27no. general classrooms and associated support teaching and tech spaces, a special needs unit, a general purpose/dining hall, a library, offices and meeting rooms, and other ancillary accommodation, and to include photovoltaic panels at roof level, (3) the construction of a new, separate sports hall building with a total gross internal floor area of 1097.9m2, incorporating a multi-use hall and associated changing and equipment storage spaces, a fitness suite, a meditation space, general storage spaces, and other ancillary accommodation, (4) the provision of a new grassed sports playing pitch in the western part of the site, 5no. hard surface ball courts to the north of the new school and sports hall buildings, outdoor seating and breakout areas, a special needs unit garden, a tech yard, an external material and bin store (133m2), a new substation and switchroom (24.5m2), Liquid Petroleum Gas (LPG) and Air Source Heat Pump (ASHP) compounds, hard and soft landscaping with footpaths, public lighting, and all associated boundary treatments, (5) modifications to the existing site entrance arrangements to include a minor realignment of the existing vehicular and pedestrian entrance from the south, and the provision of a new, gated pedestrian access from Eastwood to the north, (6) parking and access arrangements to include modifications to the bus set down areas and to the internal road layout, and parking provision for 87no. cars, inclusive of 5no. disabled spaces and 5no. electric vehicle charge points, 125no. sheltered bicycle stands providing 250no. sheltered bike parking spaces, and 10no. uncovered bicycle stands providing 20no. short stay visitor bike parking spaces, (7) new foul and surface water drainage system works incorporating SUDS measures, attenuation, rainwater harvesting, and all other associated site and development works. A Natura Impact Statement has been prepared in respect of the proposed development
Retention Permission for temporary prefabricated building to provide 3 nr classrooms No1. Science Room, No2. Construction Studies Room, No3. Home Economics Room and ancillary site works.
Source match
Matched from public planning record 21203The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table