Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

Rathmore , Sixmilebridge , Co Clare

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

8% of nearby decided applications were refused. The preview found 350 nearby planning records within 5 km where a location match is available.

Matched source
21990
Project type
One-off house
Coverage
5 km radius
350Nearby applications
8%Refused
322Conditional grants
0Refusal reasons

Top refusal reasons nearby

No reasons on record yet

More refusal reasons are being processed from public planning records.

Nearest similar decisions

21990

To Extend the Appropriate Period of Planning Permission for P16-575 to construct a dwelling house, entrance, wastewater treatment system and all ancillary site works

Granted0.0 km01 November 2021
19615

For development which consists of the construction of a cubicle house onto existing slatted unit, new milking parlour and associated site works

Granted0.5 km13 September 2019
2360078

For alterations to the elevations, site boundaries and site layout plan granted full planning permission under planning reference number P21/905

Granted0.6 km11 May 2023
21905

To construct a single dwelling house, garage, advanced wastewater treatment system and ancillary site works

Granted0.6 km15 October 2021
1930

For development which consists of the construction of a slatted unit and associated site works

Granted0.7 km07 March 2019
21385

For development, the development consists of the construction of a slatted unit extension onto existing slatted unit and associated site works

Granted0.7 km14 June 2021

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required