For the subdivision of the industrial building, the RETENTION of its use as a training and education centre for aerial dancing and the construction of a three storey internal partition and insulating of the building fabric
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Unit 2 Burlington Business Park , Gillogue , Co Clare
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
9% of nearby decided applications were refused. The preview found 257 nearby planning records within 5 km where a location match is available.
- Matched source
- 221009
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
To erect a warehouse for storage purposes, including all associated site works
For development which will consist of the construction of a two storey extension to the rear and internal modifications to existing dwelling and all ancillary site works
For development which will consist of: a two storey extension and alteration works to the rear of the existing house; renovation of existing front porch; installation of proprietary waste water treatment system and sand polishing filter; relocation of entrance to south east corner of site and closing up of existing entrance; and all ancillary works to facilitate the development
To construct dwelling house, garage, waste water treatment system, percolation area, entrance and all associated site works
Of two additional windows to the side of house and one additional window to the rear of house at first floor level and also retain minor alterations to size of other windows and to location of windows and all associated site works
Source match
Matched from public planning record 221009The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report