To erect a dwellinghouse, garage, entrance and install an effluent treatment system and soil polishing filter and all associated site works
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Cloonfadda , Killaloe , Co Clare
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
11% of nearby decided applications were refused. The preview found 247 nearby planning records within 5 km where a location match is available.
- Matched source
- 221057
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
To erect a dwelling house, garage, entrance and install an effluent treatment system and soil polishing filter and all associated site works
For change of use of part of existing dwelling from existing garage area to playroom and services area
To fill the existing poor quality agricultural land with stone and soil in order to raise the level of the ground, re-locate existing agricultural entrance, including all ancillary site works
For the construction of a new, two storey detached house, single storey detached garage, waste water treatment and disposal system, bored well, new site entrance and all associated works
Of the development which consists of: a) Alterations to the internal road layout and b) Existing road entrance and c) A change of layout of camping pods and d) A change of camping pod type, all from that previously granted Planning Permission under Planning Reference No. P.16/114. It is proposed to retain the development for an indefinite period.
The full report covers all 247 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record 221057The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report