Retention permission for a new front boundary wall, vehicular entrance with off street parking and all associated site works
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
4 Templeowen , Tullow , Co. Carlow
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
12% of nearby decided applications were refused. The preview found 282 nearby planning records within 5 km where a location match is available.
- Matched source
- 22378
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
The proposed development comprises the construction of: A) a 1062m2 warehouse extension to the south of an existing light industrial warehouse building; B) demolition of an existing 92m2 light industrial unit; C) a 105m2 extension to the west of an existing light industrial warehouse building; D) hard and soft landscaping, boundary treatments, and all associated works and site works to facilitate the development
The construction of an extension to the northeastern end of an existing manufacturing unit and all associated site works
The construction of an industrial unit, connection to existing site services and all associated and ancillary development works
Development at a site at the entrance to the Tullow Wastewater Treatment Plant, Bunclody Road (N81), Tullow, Co. Carlow, R93 RY69 measuring approximately 0.14 hectares. The development will consist of [1] the retention of the existing ‘as built’ wall to the north and south of the site entrance to the Tullow Wastewater Treatment Plant; [2] the demolition of part of the ‘as built’ southern wall, fence and hardstanding; [3] the construction of a new realigned section of wall, concrete hand standing and fence to tie in with the remainder of the ‘as built’ wall, footpath and fence; and [4] hard and soft landscaping works and other associated site development works above & below ground necessary to deliver the development
Development at a site entrance to the Tullow Wastewater Treatment Plant, measuring approximately 0.0605 hectares. The development will consist of works to improve the visibility splay at the ertrance to Tullow Wastewater Treatment Plant, including; demolition of the existing boundary fencing; construction of new retaining boundary walls and new boundary fencing and the provision of a new grass verge along the N81. The development will also consist of the: relocation of existing road signage; relocation of utility and light standard poles; all hard and soft landscaping; and all other associated site excavation, infrastructural and site development works above and below ground including changes in level and boundary treatments
Source match
Matched from public planning record 22378The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report