Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

Gallonnambraher , Ballyjamesduff , Co. Cavan

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

7% of nearby decided applications were refused. The preview found 236 nearby planning records within 5 km where a location match is available.

Matched source
23205
Project type
One-off house
Coverage
5 km radius
236Nearby applications
7%Refused
219Conditional grants
0Refusal reasons

Top refusal reasons nearby

No reasons on record yet

More refusal reasons are being processed from public planning records.

Nearest similar decisions

23205

To construct an agricultural building for the purposes of machinery and animal feed storage together with all associated site works. Significant further information and revised plans have been submitted.

Refused0.0 km24 January 2024
2460272

To construct an agricultural building together with all associated site works

Granted0.0 km11 December 2024
1827

To form new entrance and all associated works

Granted0.3 km13 March 2018
19378

For retention permission and permission to complete the development, the development consists of (1) revised site layout (2) site boundaries (3) alterations and amendments made to floor plan layout and elevations of storey and a half type dwelling from that previously granted under planning Ref No. 05/1583 and (4) all associated ancillary site works

Granted0.5 km08 June 2020
21655

For development consisting of: Installation and operation of a solar farm with an export capacity of approximately 8mw to include photovoltaic panels array with mounted steel frames on screw pile foundations, within an overall site area of 16.67ha, 10 no. Inverter station, substation, communications building, pole mounted security cameras, ducting & underground electrical cabling, boundary fencing and site entrance, together with all associated site works and services. The proposed lifetime of the project is 25 years. A Glare Assessment Report will be submitted to the planning authority with the application

Granted0.5 km06 July 2022
22107

To erect detached storage shed for both domestic and agricultural use and all associated works

Granted1.0 km09 June 2022

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required