Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

Ballybreen , Kilfenora , Co. Clare

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

8% of nearby decided applications were refused. The preview found 95 nearby planning records within 5 km where a location match is available.

Matched source
2360137
Project type
One-off house
Coverage
5 km radius
95Nearby applications
8%Refused
87Conditional grants
0Refusal reasons

Top refusal reasons nearby

No reasons on record yet

More refusal reasons are being processed from public planning records.

Nearest similar decisions

2360137

To RETAIN an extension to the existing single storey dwelling

Granted0.0 km27 June 2023
233

To build a new dwelling house, install a wastewater treatment system & all other site and ancillary works

Granted0.1 km31 March 2023
22281

Of the changes to the dwelling which was previously granted permission under Refence P18/869 & all other associated works

Granted0.1 km23 May 2022
18869

To construct a new dwelling house, proprietary waste treatment system and all associated site works

Granted0.1 km15 May 2019
20679

To construct a dwelling, garage, on-site wastewater treatment system, a new entrance and ancillary ground works

Refused0.6 km18 November 2020
2560011

For the proposed development which will service and consist of alterations to the Kilfenora wastewater treatment plant and percolation area development approved by An Bord Pleanála under reference ABP-305756-19, and consists of: 1. Disconnection and capping of existing gravity effluent pipe (pipework to be retained in situ); 2. The installation of a new gravity effluent pipe and connection to pumping station; and, 3. All ancillary site development and excavation works above and below ground necessary to facilitate the development. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application

Granted0.6 km12 March 2025

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required