For the construction of a new dwelling house and garage complete with a new entrance, sewage treatment system and ancillary works
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Ballygriffy North , Ruan , Ennis Co Clare
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
5% of nearby decided applications were refused. The preview found 476 nearby planning records within 5 km where a location match is available.
- Matched source
- 2360566
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
To construct dwelling house, garage, treatment system and carry out ancillary site works
Planning ref: P22/72 for the construction of a new two-storey 4 bedroom detached dwelling house with new garage, water treatment system, vehicular access, and the carrying out of all other ancillary works on site.
For the following development: Demolition of existing incomplete derelict structure and the construction of a new 1.5 storey detached dwelling, detached domestic garage, new entrance, proprietary waste water treatment system, connection to necessary services, boundary treatments and all associated site works
Of additional windows to the Front, Rear and South facing sides of dwelling, RETENTION of the replacement of the garage door with a window and door to the front of the dwelling, RETENTION of changes to the plaster design finish, RETENTION of the reduced ridge height and RETENTION of the removal of the roof window to the front of the dwelling
To construct a new Agricultural entrance/gate and associated site works to access farmlands.
Source match
Matched from public planning record 2360566The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report