Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 1,043 decisions within 5 km, 1 exact-site or onsite candidate record, and 79 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Clare County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Clare County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Clare County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
79 structured nearby appeal records.
79 matchedNo current-dated citation is loaded for Clare County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Of existing garden shed, as constructed
To construct a single dwelling house, garage, advanced wastewater treatment system along with ancillary site works
For the demolition of the existing garage and boiler house, the construction of a carport and new garage along with all associated works
Of works to the rear boundary wall of property including raising the wall height, adding piers and the installation of 2 access doors.
To convert an existing gym to three additional family guest rooms, provide additional storage area, erect 2 no. Glamping Pods at the rear of the site together with connection to existing services, RETAIN an existing storage shed and include all associated site works
For development which will consist of the extension of the caretaker/owner’s apartment to include an additional en-suite bedroom at first-floor level. The development will also include the conversion of the existing semi-basement storage area to two guest bedrooms and a games room; the conversion of the ground floor games room to a guest bedroom; conversion of attic space to four ensuite guest bedrooms; and the conversion of the existing garage to night porter accommodation. Permission is also sought for a side staircase extension, two external guest rooms in the side garden, extension of the existing car park, modifications for ramped access, elevational change and all associated site works. A Natura Impact Assessment has been prepared as part of the application
The brief summarizes the pattern across all 1,043 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 25384The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief