For construction of a sheltered canopy (c 80 sq.m) over 3 no dedicated van parking spaces in the existing service yard and all ancillary site services and site development works
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Tesco Thomas Street , Bailieborough , Co.Cavan
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
6% of nearby decided applications were refused. The preview found 221 nearby planning records within 5 km where a location match is available.
- Matched source
- 2548
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
To retain "Click and Collect" signage in the existing Tesco car park
(i) construction of a sheltered canopy (c. 50 sq.m) in the existing car park for the purpose of providing 2 no. dedicated "Click and Collect" spades for the existing Tesco store; (ii) ancillary signage; and (iii) a pedestrian crossing and all associated site development works
For (i) retention permission for the relocation of the existing click and collect signage (ii) planning permission to extend the existing canopy (as permitted under ref 21647) by c 25.61 sq m to provide a total of 3 sheltered click and collect car parking spaces for the existing Tesco store and (iii) all associated site development works
For a 10-year duration planning permission is sought for works to upgrade the Bailieborough Wastewater Treatment Plant in the townland of Beckscourt, Bailieborough Co. Cavan. The proposed development consists of upgrades to the capacity of the existing WwTP. The proposed development consists of the following elements: (i) Demolition and replacement of existing Inlet works; (ii) SWO outfall from existing Storm Water Tank to be decommissioned; (iii) Proposed Dual Function Overflow outfall pipe connection from the WwTP inlet works to an existing drainage culvert pipeline; (iv) Provision of 1 no. new Storm Water Storage Holding Tank and associated SWO outfall pipe connection to the existing drainage culvert pipeline; (v) Provision of 1 no. aeration tank and 2 no. settlement tanks; (vi) Demolition of the existing oxidation ditch and clarifiers; (vii) Provision of below and above ground chambers (pump chambers and process drainage); (viii) Provision of service water pump sump (wash water recycle system to clean equipment); (ix) Provision of new WwTP Primary Discharge outfall pipe connection to the existing drainage culvert pipeline; (x) Provision of 1 no. picket fence thickener and mechanical dewatering unit; (xi) Provision of chemical storage and dosing equipment for alkalinity boosting, phosphorus removal and sludge treatment; (xii) Provision of 1 no. building (Sludge dewatering building) of operating equipment and 2 no. of kiosks (Intake MCC Kiosk and Aeration Tanks MCC Kiosk); (xiii) Provision of odour control unit and associated above ground ductwork; (xiv) Provision of a back-up generator with diesel tank to be used in an emergency/power cut; (xv) Provision of an ESB substation; (xvi) Demolition of the existing tanks not used in the future design (i.e., inlet works, storm tank, oxidation ditch, circular clarifier and drainage/process pump sumps, polymer preparation building, sludge blanket thickener, sludge holding tank, scum chamber and sludge dewatering kiosk); (xvii) Extension of internal access road and provision of turning head to the northern end of the site; (xviii). Ancillary and associated development including: a) Equipment lifting gantries, access platforms; b) Provision of paved/pebble area within the site; c) Landscaping works d) Replacement of site fence; e) Mechanical and electrical service connections; (xix) Installation of south facing Solar PV Panels; (xx) Retaining wall to the northern part of the site and entrance of the site. A Natura
For development consisting of; 1) change of use of part of an existing dwelling to commercial office space, 2) provision of external signage and 3) all ancillary site development works
Source match
Matched from public planning record 2548The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.