For the i) demolition of a disused storage shed, ii) development of 22no. own door residential units, comprised in 2no. two storey blocks, Block A comprises 6no. 2 Bed apartments (located at ground floor) and 6no. 1 bed duplex units (located at first floor level); Block B comprises 5no. 2 Bed apartments (located at ground floor) and 5no. 1bed duplex units (located at first floor level); iii) construction of associated entrance and site service road, free standing bin stores, car parking and bicycle parking, iv) provision of public amenity spaces and public lighting, v) connection to public sewer and watermain, vi) erection of boundary treatments and retaining structures and vii) all associated site works- SIGNIFICANT FURTHER INFORMATION HAS BEEN RECEIVED
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Tullymongan Upper , Cavan , Co. Cavan
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
5% of nearby decided applications were refused. The preview found 633 nearby planning records within 5 km where a location match is available.
- Matched source
- 2560170
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
To retain location of existing dwelling house and site boundaries
To retain existing entrance
For a gated vehicular access and hardstanding area to enable the siting of a standby generator for use on a temporary basis during periods of electrical outages
For the construction of a single storey side extension to existing dwelling and all ancillary site works
Retention of existing prefab structure for use as preschool and community use and all associated site works. (Previous retention permission approved under reg. no. 18/74)
Source match
Matched from public planning record 2560170The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report