For a 2-storey masonry constructed dwelling, new site entrance, gates, piers, walls, septic tank, percolation area and all other associated site works. SIGNIFICANT FURTHER INFORMATION HAS BEEN RECEIVED
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Shinan , Shercock , County Cavan
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
7% of nearby decided applications were refused. The preview found 123 nearby planning records within 5 km where a location match is available.
- Matched source
- 2560367
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
For (i) restoration works to an existing cottage, including minor elevation and internal modifications; (ii) adjustment of existing private access roads; (iii) a new proprietary wastewater treatment system and percolation area; and (iv) all other associated ancillary site works
The construction of a single storey extension to the side of existing semi-detached bungalow, demolition of garage to rear and all associated site development works
To retain and complete revised elevations, garden & floor levels to two storey over basement rear extension to existing two storey over basement townhouse, removal of rear shed, additional basement accommodation and external steps to ground floor to the previously approved application no. 17/63 and all associated site works
Conversion of existing shop, residence and sub-division to 2 no. dwellings, 2 no. two-storey extensions to rear, 1 no. over basement, incorporating two-storey out-building as ancillary space, with alterations to elevations and site development works- SIGNIFICANT FURTHER INFORMATION HAS BEEN RECEIVED.
To construct a two-storey building containing 4 No. Apartments, use of existing site entrance, connect to public sewer and water main and all ancillary site works. Significant further information and revised plans have been submitted
Source match
Matched from public planning record 2560367The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report