Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 69 decisions within 5 km, 1 exact-site or onsite candidate record, and 2 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2 structured nearby appeal records.
2 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For the following: (1) Retention Permission for the increase in floor area and change in elevations of the existing extension to the community centre building to that as granted under previous Planning Reference PD/00/637 (2) Retention Permission for the change of use of existing extension from performance stage, dressing room and meeting room (as granted under previous Planning Reference PD/00/637) to main hall floor extension, 2 No. Disabled WC's, ancillary storage room and entrance/exit lobby (3) Full Planning Permission for the installation of a new percolation area and connections to same from existing septic tank currently serving the existing community centre. (4) Full Planning Permission for the demolition of the existing rooms to the rear and side of the existing community centre building (5) Full Planning Permission for the construction of a proposed extension to the existing community centre building. All the above together with minor elevation changes, proposed car parking, connection to services and all ancillary site development works at
Permission to retain as constructed domestic garage and as constructed site boundaries which differ to that granted under PD/18456A/93 along with all ancillary site development works at
(1) Retention permission for existing first floor extension to rear of existing dwelling house and (2) Full planning permission for the change of use of the existing domestic shed to habitable space and permission for a proposed extension to same, all to form an en-suite bedroom associated with existing dwelling house together with minor elevation changes and all ancillary developments at
Permission to construct a new slatted shed together with all associated site works at
Permission to construct a new slatted shed, new manure pit and new agricultural entrance onto the public road together with all associated site works at
Retention Permission for the following: 1). Retention of existing previously permitted basement which was granted full Planning Permission under PD/00/966 so as to be used as habitable accommodation to service existing dwelling house. 2). Retention of existing alterations to the rear façade of existing Dwelling House. 3). Retention of Additional Driveway Entrance to service existing Bungalow Type Dwelling House which was previously granted full Planning Permission under PD/99/1322 and all Ancillary Site Works at:
The brief summarizes the pattern across all 69 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18468The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief