Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 116 decisions within 5 km, 4 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission for: (i) retention of dwelling house and associated site works (at variance to the approved drawings of planning references 01/6490 and 04/4250), (ii) permission for two extensions to dwelling house, and (iii) permission for re-location of entrance to dwelling
Permission for changes to campsite permitted under Pl. Reg. 16/10; (a) relocate the proposed percolation area, (b) replace 2 no. proposed geodomes with 2 no. cabins/pods and (c) change of design of the 2 no. permitted cabins/pods. Permission is also sought for 2 additional cabins/pods, all for short term letting
A managed holiday complex for short term letting comprising (a) campsite building containing showers, toilets, plant rooms, laundry and kitchen/serving area, (b) 16 no. campsite pitches, (c) 6 no. camping pods, (d) entrance and car parking, (e) waste water treatment system, (f) internal access roadways/pathways with associated lighting and all associated site works
(a) Demolition of dwelling house (b) Construction of dwelling house and attached ancillary accommodation (c) Construction of detached yoga and treatment studio with accommodationn (d) Waste water treatment system and all associated site works
Construction of 2 no. dwellinghouses and all associated site development & landscape works A Natura Impact Statement (NIS) has been prepared and will be submitted to the Authority with this application
Permission to construct 2 no. dwellings for short term/holiday letting and for use as overspill accommodation from the existing Heron's Cove B&B and to install a waste water treatment plant, and all associated site works
The brief summarizes the pattern across all 116 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 24/154The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief