Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 190 decisions within 5 km, 2 exact-site or onsite candidate records, and 5 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedZoning and settlement layers were intersected with the selected site against the loaded source datasets.
2 matchedOne current citation from the Galway County Council development plan, with section, page and source URL.
1 matched3 of 4 layers are loaded for Galway County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
5 structured nearby appeal records.
5 matchedCitations are current-dated and carry policy name, section, page and source URL from the Galway County Council development plan.
1 matchedOpen preview
Open preview
Of 1: the existing dormer window and Velux roof light on the front roof façade of the dwelling house. 2: of the existing wooden garden shed. 3:of the additional ground floor window in the rear elevation of the dwelling house from previous planning application reference numbers 02/3244 and 04/2174 and all ancillary site works.Gross floor space of work to be retained House: 234.2 and Shed: 8.20sqm.
Of garage as built on site, all as per drawing documentation submitted together with all ancillary site works and services. Gross floor of space of work to be retained: 50.83 sqm.
Of planning to application ref number 082873 & 13641, for the following changes, on front elevation --changes to window layout, enlarged porch design. On rear elevation-- changes to window layout, including velux windows to attic storage / office space. On side elevations-- additional windows at ground floor level. Also retention of attic conversion to storage and office space. Relocation of site entrance to centre of site and retention and completion for garage with foundation now in place. Gross floor space of proposed works: Garage - 60 sqm. Gross floor space of work to be retained: Attic - 38 sqm
To construct a dwelling house, domestic garage, effluent treatment system, percolation area, and all associated works. Gross floor space of proposed works: House: 209.7 sqm & Garage: 40 sqm.
To construct a dwelling house, domestic garage, effluent treatment system, percolation area, and all associated works. Gross floor space of proposed works: House: 230 sqm & Garage: 50 sqm. This site was previously granted planning permission under Planning Reference 22/3. Permission is also sought for a mobile home on site for the duration of the construction period
For the construction of a one and a half storey dwelling house and garage, site access and installation of approved effluent treatment system, including all associated site works
The brief summarizes the pattern across all 190 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2360030The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief