Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 195 decisions within 5 km, 1 exact-site or onsite candidate record, and 1 structured appeal.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1 structured nearby appeal record.
1 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission to retain as built bungalow style dwelling house and domestic garage, wastewater treatment system and percolation area, all associated site works, the revised position of the site and site boundaries. As the position of all of these items of work and features differ to that granted planning permission under planning reference number 02/330.
Permission for a development consisting of 1) Proposed change of use of structure known as Cahans Meeting House (Protected Structure) from former place of worship to museum and general purpose spaces. Proposed installation of new heating and electrical systems, tea station in entrance lobby and associated construction and conservation works and internal decoration. 2) Proposed change of use of school house building located on the site from store and lecture hall to WC facilities at ground floor and meeting room space at first floor. Proposed installation of new heating and electrical systems, and associated construction and conservation works. Proposed repair works to roofs, windows and walls including re-rendering. 3) Proposed site works to include new car park and entrance onto adjacent roadway and alterations to existing hedge to allow for sight lines. New Pathways between car park and meeting house and school house building and lighting of same. Proposed new wastewater treatment system and percolation area. All associated works in relation to the above works.
Permission for development consisting of a redesigned two-storey dwelling and associated single car garage from the dwelling and garage granted under application number 2289, the repositioning of the vehicular entrance to the site and changes to the approved wastewater treatment system and polishing filter together with all associated site development works. All other aspects of the development to remain as previously approved. Significant further information received relates to moving the entrance back to the original position under 22/89.
Erect a storey and a half dwelling, treatment plant, percolation area, new entrance and all associated site works.
Permission to erect a two story dwelling, detached domestic garage, sewerage treatment unit, percolation area, new entrance and all associated site works.
Permission to consist of the construction of 1 No. two storey dwelling, new site entrance onto public road, provision of effluent treatment system with percolation area and all ancillary site works
The brief summarizes the pattern across all 195 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 19272The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief