Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
2% of nearby decided applications were refused. The site check found 154 decisions within 5 km, 1 exact-site or onsite candidate record, and 7 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
7 structured nearby appeal records.
7 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Retain and complete dwelling and garage as constructed and all associated works ref. previous planning ref. nos P.02/542 and P.06/643 and Planning Permission to install sewerage treatment system and percolation area
Construct a bell mouth entrance onto public road to facilitate access to forestry plantation together with internal access road and all associated site works
Garage and store for domestic use as constructed & connected to all associated services
(1) retain 2 roof lights to front of dwelling (2) Permission to convert attic to open plan playroom (3) Retain Hay Shed/Farm Machinery Shed, ref. previous Planning Ref. No. P01/979
Renovate and extend existing two-storey dwelling with the construction of two-storey and single storey extensions to front and gable elevations, replacement roof finish, alterations to elevations, connection to existing services and associated site development works.
1. construct a dormer type domestic dwelling. 2. To construct a domestic garage. 3. To construct a new site entrance. 4.To construct a Waste Water Treatment System to current EPA Code of Practice and all ancillary works
The brief summarizes the pattern across all 154 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2068The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief