Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
21% of nearby decided applications were refused. The site check found 416 decisions within 5 km, 2 exact-site or onsite candidate records, and 29 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched1 of 2 layers are loaded for Kildare County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedOne current citation from the Kildare County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Kildare County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
29 structured nearby appeal records.
29 matchedCitations are current-dated and carry policy name, section, page and source URL from the Kildare County Council development plan.
1 matchedOpen preview
Open preview
For (1) To retain alterations to original dwelling, increase in ridge height granted under Pl. Ref. 02/759 (2) To retain alterations to existing out-building including alterations to elevations and increased floor area previously granted under Pl. ref. 02/759 (3) Permission for alterations and renovations to existing dwelling including: (a) conversion of attic space to include habitable accommodation (bedroom/office/store) (b) Installation of dormer windows to rear elevation (c) Minor alterations to ground floor layouts (d) Addition of flat roofed canopy/porch to front elevation (e) Minor increase in size of outbuilding (f) And all associated and auxiliary site works
(a) decommissioning and backfilling existing septic tank and (b) installation a new on-site domestic wastewater treatment system, connection to existing dwelling house and all associated development works
(a) porch extension to front of existing dwelling house, (b) modifications to window arrangement to front and side elevations to include 2 no. bay windows to front elevation, 1 no. bay window to side elevation, (c) lean-to type shed structure connecting to existing domestic shed located at the rear of the property, (d) connection to all existing services on site and all associated development works
For a) A dormer style extension to the rear of existing dwelling b) A detached single storey garage to the rear of the property c) A detached single storey boiler shed to the side of dwelling
Permission sought for the demolition of existing derelict dwelling, floor area of C.70 m2, and the construction of dormer style bungalow with connection to existing local Authority waste water treatment system and all associated site works
Sought for the demolition of existing derelict cottage, floor area 70m², and the construction of dormer style dwelling with on site waste water treatment system and all associated site works
The brief summarizes the pattern across all 416 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2560675The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief