Applications tied to the site
Partial coverage6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 1,150 decisions within 5 km, 6 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The development will include extending the existing Wildlife Park to include the development of approx 10.5 Ha of additional lands for which permission for development was previously granted under S/03/2273. The development works will include the construction of 17 no. buildings which includes 13 buildings for animal housing, an educational/viewing building, an entrance ticket building with small souvenir shop, a restaurant with public toilets, and an animal dung storage building. It also includes the extension of an existing pond, the construction of two new ponds and a connecting canal to a wetland that will provide a natural vegetative filtration system using halotolerant plant species. It includes the completion and extension of existing internal roadways, construction of pathways including a raised walkway, modification and addition to existing landscaping, preservation works to disused lime kiln, underground services, re-configuration of roadway markings and signage at main entrance from the public road, and construction of flood prevention measures to the existing wildlife park lands and to the additional lands by the construction of an earth berm, repairing sea wall and reconstructing sluice system. Extension of Duration of Permission granted under Planning ref 13/5641, an EIS was submitted with the application.
Permission for the erection of a new steel-framed building to house a group of Siamang Gibbon. This new building will replace the small existing timber Siamang Gibbon building which is to be demolished. The development includes the construction of a new pedestrian pathway to the new building, the installation of a foul sewage holding tank and all associated site development works. A Natura Impact Statement (NIS) will be submitted with the application.
Construction of a sheltered viewing structure with associated raised access walkway and site development works at the Giraffe/Zebra compound
Erection of single storey Madagascan Wildlife interpretative building, 2 No buildings to house Madagascan Lemur, together with all associated site development works.
Construct a bird-viewing shelter together with associated access pathway and site development works, and also for permission to construct a boardwalk through wetlands.
Demolish an existing monkey house and to construct a replacement monkey house together with all associated site development works
The brief summarizes the pattern across all 1,150 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18/6097The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief