Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 402 decisions within 5 km, 2 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched1 of 2 layers are loaded for Cork County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matched2 current citations from the Cork County Council development plan, each with section, page and source URL.
2 matched3 of 4 layers are loaded for Cork County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Citations are current-dated and carry policy name, section, page and source URL from the Cork County Council development plan.
2 matchedOpen preview
Open preview
Retention of sunroom as constructed to rear of existing dwelling house, retention of single storey dining room in lieu of permitted garage to side of dwelling house with flat roof comprising balcony area, parapet wall and French doors leading to balcony area from first area and Retention of alterations to site boundaries and entrance as constructed (alterations to house design and waive condition no.3 Pl. Reg No. 03/4846 which specified that flat roof over garage shall be omitted and replaced with a pitched roof and French doors and balcony shall be omitted).
Construction of a dwelling, foul water treatment system, garage, site entrance and associated site works
Permission for the following; a) enlargement of existing farm entrance, b) construction of access farm passage, c) construction of silage slab, dungstead area & a 7000 gallon effluent tank, d) construction of a haybarn & machinery shed and e) an easy feed/house with slatted tank (capacity c.875.5 cubic metres)
Construction of a slatted house with slurry tank, loose house, stables, hay store, manure store and associated works.
Permission for Retention of the following a) Construction of general farm building which includes, storerooms, machinery shed, calf house & hay barn. b) As constructed (change of plans, previously granted under 07/4638) slatted cattle shed and c) As constructed (change of plans, previously granted under 15/5050) agricultural shed.
1) construct a single storey extension to the existing dwelling house including alterations to the existing elevations, 2) replace the existing septic tank with a new wastewater treatment system in accordance with the EPA Code of Practice for Domestic Waste Water Systems 2021, 3) alter the existing vehicular entrance and 4) for all the associated site works.
The brief summarizes the pattern across all 402 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 18/5905The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief