Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 197 decisions within 5 km, 1 exact-site or onsite candidate record, and 6 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
6 structured nearby appeal records.
6 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
SITE DEVELOPMENT WORKS COMPRISING OF EXTENSION OF CARAVAN PARK WITH THE CREATION OF 5NO. CONCRETE HARDSTANDS, CONCRETE RETAINING WALL, GAS AND BIN STORAGE AREA & SITE SERVICES AND PERMISSION FOR (1) PROVISION FOR 6NO. CONCRETE HARDSTANDS AND SITE SERVICES FOR A TOTAL OF 11 NO. STATIC MOBLE HOMES AND CONNECTION TO EXISTING SEWAGE SYSTEM ALL AS PREVIOUSLY APPROVED UNDER PLANNING REF NO. 03/5116
ERECTION OF 4NO. GLAMPING PODS WITH SEPTIC TANK AND PERCOLATION AREA, NEW VEHICULAR ACCESS, INTERNAL ACCESS ROAD, CAR PARKING FACILITIES AND ALL ASSOICATED SITE DEVELOPMENT WORKS
ERECTION OF 4 NO. GLAMPING PODS WITH SEPTIC TANK AND PERCOLATION AREA, NEW VEHICULAR ACCESS, INTERNAL ACCESS ROAD, CAR PARKING FACILITIES AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
ERECTION OF 4 NO GLAMPING PODS WITH SEPTIC TANK AND PERCOLATION AREA, UPGRADING EXISTING VEHICULAR ACCESS, INTERNAL ACCESS ROAD, CAR PARKING FACILITIES AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
(A) TEMPORARY PLACEMENT OF MOBILE HOME ON SITE TO BE REMOVED UPON COMPLETION OF DWELLING, AND (B) CONSTRUCTION OF DWELLING HOUSE WITH SEPTIC TANK AND PERCOLATION AREA, UPGRADING OF EXISTING ENTRANCE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF (1) EXTENSION INCLUDING A DORMER WINDOW AND EXTERNAL FIRE ESCAPE STAIR TO THE EAST SIDE OF EXISTING DWELLING HOUSE AND (2) 2 NO. DORMER WINDOWS TO REPLACE 2 NO. VELUX TYPE ROOF WINDOWS ON THE SOUTH FACING PITCHED ROOF OF EXISTING DWELLING HOUSE
The brief summarizes the pattern across all 197 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2152446The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief