Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 683 decisions within 5 km, 2 exact-site or onsite candidate records, and 40 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
40 structured nearby appeal records.
40 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Retention for the conversion of existing mezzanine floor into office/store room at first floor level, replacement of existing window to new type window to the south-east elevation, addition of double doors to the north-west elevation with all associated site works and services. Retention permission is also sought for extending internal floor area at first floor level, internal stairs to access extended office, alterations to elevations, site entrance, access road, boundary fence, footpaths and car parking area which formed part of previously granted planning ref no 06/5247 & 03/5291. The application includes the significant amendments made on the proposed development will consist of the following, revised red boundary line to include access road to the applicants site to be retained. Change of use of partial ground floor warehouse/manufacturing area to office area. Proposed native species hedgerow screening to be planted along the rear south-west wall of the yard, and metal plank screening to be located to the north-west and the south-east boundary fence of the yard
Change of use of ground floor Unit C from Enterprise and Employment (506sqm.gross floor area ) to office use, revised elevations, new signage and provision of 16 car parking spaces and bicycle parking and all associated works including connecting into existing drainage.
The construction of a set of hinged gates, piers, fencing, landscaping and all associated site works to shared access roadway
The development consisting of the following works, warehouse and process hall with offices and welfare facilities (circa 1895 sq m) new road entrance, 2 no dock levellers to north facing elevation, new concrete yard, staff and visitor parking with all associated site works
Construct a single storey extension to the south western side of the existing building and all associated site services
Construction of a single storey extension to the southern side of the existing building and all associated site services
The brief summarizes the pattern across all 683 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 206114The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief