Applications tied to the site
Partial coverage17 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
17 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 282 decisions within 5 km, 17 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
17 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
17 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The construction of 29 no. dwelling houses and all associated ancillary development works including access roads, parking, footpaths, landscaping and amenity areas. Access to the proposed development will be via the existing entrance and access serving Berry Hill (the proposed dwelling houses will replace 30 no. residential units previously permitted under Pl. Reg. No. 03/6072 (An Bord Pleanala PL 04.206120) and extended under 12/5517). Extension of Duration to Permission granted under Planning Ref. No. 16/6474 & PL 04.206120
Permission for the construction 5 no. 4 bedroom detached dwelling houses and all ancillary site development works. The proposed development is a change of plan from that currently permitted by Cork County Council Reference 16/06474 and An Bord Pleanála Reference PL 04.248520 (as extended by Cork County Council Reference 22/5198) and will result in the construction of 1 no. additional dwelling house. Access to the proposed development will be provided via the existing estate entrance and internal network of the Berry Hill residential development.
Permission for extension to existing dwelling.
The construction of an agricultural entrance and associated site works.
The construction of an 18 metre high free standing communications structure with its associated antennae, communication dishes and ground equipment. The development will form part of Eircom Ltd existing telecommunications and broadband network.
To alter and extend dwelling as follows, 1) Alter front porch from flat to “A” type roof, 2) Extend dwelling to side and rear, 3) Raise finished floor level by 300mm, 4)Raise window heights on front elevation, 5) Raise roof 1m higher than it exists at present and all associated site works.
The brief summarizes the pattern across all 282 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 22/5198The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief