Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
1% of nearby decided applications were refused. The site check found 77 decisions within 5 km, 1 exact-site or onsite candidate record, and 2 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2 structured nearby appeal records.
2 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For development consisting of 1. To construct 10 no. 3 bedroom, 2 storey semi detached houses, and 8 no. 4 bedroom, 2 storey semi detached houses, total 18 no. houses at the south western end of the Woodstream Housing Development. 2. Construct new road with services and connect to existing road and services in the Woodstream Housing Development, previous grant of planning permission PL 04/1011 refers. 3. Development of 18 no. houses to be carried out on sites with revised numbering from that granted under previous grant of planning permission PL 04/1011. 4. Carry out all ancillary site works
Development consisting of the following: (1) to retain concrete bases and complete 4 no. houses (two blocks of 2 semi-detached 4 bedroom two-storey houses) and (2) permission to construct 26 no. houses consisting of 12 no. 4 bedroom two-storey semi-detached houses, 12 no. 3 bedroom two-storey semi-detached houses, 2 no. 2 bedroom two-storey semi-detached houses and (3) construct new road with services and connect to existing road and services in the Forthaven Housing Development (previous grant of planning permission PL 04/503 refers), and including all ancillary site development works
Development consisting of the construction of a new dwelling house, new garage, effluent treatment system, percolation area, formation of a new site entrance and all associated site works
For development consisting of 1) To construct 2 No, 4 bedroom, single storey detached houses with domestic garages on site Numbers 2 & 3 in the Woodstream Housing Development. 2) Connect to all services in the Woodstream Housing Development, previous grant of planning permission PL 04/1011 refers. 3) Carry out all ancillary site works
Development conisting of retention of; 1. partially constructed house with blockwork up to first floor level, 2. site development works and 3. access to estate road. Also, completion of construction of house, site development works and connection to services for house partially constructed on a site.
Development consisting of the retention to the existing shed and all the associated site works to the rear of property
The brief summarizes the pattern across all 77 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18260The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief