Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
26% of nearby decided applications were refused. The site check found 269 decisions within 5 km, 1 exact-site or onsite candidate record, and 19 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
19 structured nearby appeal records.
19 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Development at existing quarry, all within an overall area of 29.6 Hectares consists of continuance of the development granted under P.Reg.Ref. 04/1680 comprising; 1.use of asphalt/macadam plant; 2.processing operations (crushing and screening); 3.storage of aggregates; 4.ESB substation (33sqm); 5.bunded fuel store (100sqm); 6.vehicle circulation and access including wheelwash; 7.restoration of part old quarry on 5.5 hectares using imported inert materials; and all other ancillary operations. The development also comprises continuance of the quarry workings within the existing quarry extraction area of 14 hectares (granted under P.Reg.Ref. 04/1680) with an increase in depth of the workings from 128mOD to a level of 108mOD; and restoration of the overall site. The proposed operational period is 13 years plus 2 years to complete restoration (total duration sought 15 years). This planning application will be accompanied by an Environmental Impact Assessment Report (EIAR)
For 1) the construction of a new rear and side pitched and flat roof single-storey extension, including rooflights, to the existing single-storey dwelling, and all associated ground works; and consists of, 2) the retention of the existing single-storey shed to the rear of the dwelling
2 no. domestic sheds located at the rear of existing dwelling house, connection to existing site services and all associated development works
(a) Retention permission for dormer bungalow dwelling house as constructed and connection to all site services; (b) Retention permission for 2 No. domestic sheds as constructed, and (c) Full planning permission for decommissioning and backfilling existing septic tank and replacing same with new on-site domestic wastewater treatment system all associated development works
(A) Retention Planning Permission for machinery storage shed. (B) Retention Permission for storm water attenuation/storage tanks and associated silt separation building and all other site surface water drainage works discharging to onsite soakpits. (C) Full Planning Permission for new waste codes accepted on site. revised by Significant Further Information which consists of (a) new waste water treatment system and associated works, (b) revised drainage layout and all associated site works
The following (A) Single Storey extension to side of existing house. (B) Single storey garden store to front of existing house (C) All associated site development works
The brief summarizes the pattern across all 269 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 1967The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief