Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 196 decisions within 5 km, 4 exact-site or onsite candidate records, and 6 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matched1 of 2 layers are loaded for Mayo County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedOne current citation from the Mayo County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Mayo County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
6 structured nearby appeal records.
6 matchedCitations are current-dated and carry policy name, section, page and source URL from the Mayo County Council development plan.
1 matchedOpen preview
Open preview
PERMISSION FOR 2 NO. EXTENSIONS TO BLOCK D, AN EXTERNAL FIRE ESCAPE STAIR TO THE SOUTH OF THE MAIN BUILDING. RETENTION OF ENTRANCE RECEPTION EXTENSION TO THE EAST OF THE MAIN BUILDING, 3 NO. EXTENSIONS TO BLOCK A, DAY ROOM EXTENSION TO SOUTH OF MAIN BUILDING WITH 1 NO. ROOFLIGHT, AS BUILT CHAPEL PREVIOUSLY GRANTED PERMISSION UNDER P04/3712. VARIATIONS WITH THIS PLANNING INCLUDE MINOR ALTERATIONS TO FENESTRATION, REVISED ROOFS DESIGNS AND REVISED EXTERNAL FINISHES TO CHAPEL, 3 NO. EXTENSIONS, 8 NO. ROOF LIGHTS AND INCLUSION OF A FIRST FLOOR TO THE MAIN BUILDING, AS BUILT EXTENSION (ST ANNES' WING) TO BLOCK C WHICH IS LARGER THAN PREVIOUSLY GRANTED PERMISSION UNDER P04/3712, 3 NO. EXTENSIONS TO ST ANNES WING, 1 NO. EXTENSION TO END OF BLOCK D, STORAGE BUILDING WITH STAFF CANTEEN/FACILITIES AND BOILER TO WEST OF MAIN BUILDING, STANDALONE WOOD PELLET BOILER AND SILO, INSTALLATION OF A 40' CONTAINER FOR THE TEMPORARY STORAGE OF PPE AND ALL ANCILLARY SITE WORKS
Demolition of existing accommodation blocks, retention of granny flat and domestic shed, retention of shed and ancillary site works
CONSTRUCT BOAT STORAGE SHED ALONG WITH ANCLLARY SITE WORKS
Construction of a new gymnasium on the club grounds including all associated ground works. The gymnasium shall consist of a structural foundation and a cladded steel structure
DEMOLITION OF EXISTING DETACHED DWELLING HOUSE, CONSTRUCTION OF REPLACEMENT DETACHED DWELLING HOUSE, TOGETHER WITH ALL ASSOCIATED SITE WORKS
The development will consist of a 24m multi-user free standing support structure carrying telecommunications equipment, together with associated exchange cabinets, fencing and all associated site development works at Straide & Foxford United, Green Road, Foxford, Co Mayo. The development will provide for 3G and 4G wireless data and broadband services for Eir, Three and Vodaphone
The brief summarizes the pattern across all 196 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 22568The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief