Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 244 decisions within 5 km, 1 exact-site or onsite candidate record, and 12 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Tipperary County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Tipperary County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Tipperary County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
12 structured nearby appeal records.
12 matchedNo current-dated citation is loaded for Tipperary County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
To retain the following 1. Increase in floor area of rear extension, 2. Changes to roof elevations of rear extension to accommodate first floor development, 3. Changes to internal layout, 4. Alterations to existing elevations, 5. Revised location of effluent treatment tank and percolation area. All from that as previously granted Planning Permission under Planning Reference number 04/849. And for permission to demolish south facing single storey sunroom, for additional alterations to roof and wall elevations, to extend the first floor of rear extension, to construct a domestic garage all with associated site works
(i) existing boundary wall and (ii) existing oil storage tank as well as Planning Permission to (iii) construct extensions to an existing dwelling (iv) widen existing vehicular entrance and all associated site works
Dwelling, garage, effluent treatment system and entrance and all associated site works
(i) an existing porch to an existing dwelling as well as Planning Permission (ii) to extend an existing dwelling and all associated site works
Demolition of existing flat roof extension and lean-to extension at side & rear of dwelling respectively & removal of existing front porch. Construction of a new part single-storey and part two-storey extension to the side and rear of existing dwelling, alterations to existing elevations and roof, construction of new larger front porch in lieu of existing and all associated site boundary and site development works
Development will consist of the construction of an 18 metre high free standing communications structure with its associated antennae, communication dishes, ground equipment and all associated site development works. The development will form part of Eircom Ltd existing telecommunications and broadband network
The brief summarizes the pattern across all 244 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 211772The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief