Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 133 decisions within 5 km, 2 exact-site or onsite candidate records, and 5 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
5 structured nearby appeal records.
5 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
THE PROVISION OF A NEW REPLACEMENT DORMER DWELLING TO REPLACE EXISTING FIRE DESTORYED DWELLING (PLANNING REF. NO. 04/865) AND UTILISING EXISTING FOUNDATIONS/ BASE, GARAGE, TREATMENT SYSTEM AND SITE BOUNDARIES
(A) 1 NO. NEW BUNGALOW TYPE DWELLING, (B) 1 NO. NEW DOMESTIC GARAGE (C) INSTALLATION OF A NEW WASTE WATER TREATMENT SYSTEM (D) VEHICULAR ENTRANCE (E) NEW LANDSCAPING AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
(A) 1 NO. NEW BUNGALOW TYPE DWELLING, (B) 1 NO. NEW DOMESTIC GARAGE (C) INSTALLATION OF A NEW WASTE WATER TREATMENT SYSTEM (D) VEHICULAR ENTRANCE (E) NEW LANDSCAPING AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF A DWELLING HOUSE AND DETACHED GARAGE WITH TREATMENT SYSTEM AND PERCOLATION AREA WITH ALL ANCILLARY SITE WORKS
Amendments to the development permitted under Offaly County Council Planning Register Reference 20/494 to: (i) revise the layout of the permitted development including solar array and inverter/transformer units; (ii) increase the height of the permitted solar array from 2.914 metres to up to 3.3 metres; (iii) provide for variable spacings between the solar array rows; (iv) provide for varying solar array tilt-angles; (v) alter the design of the electrical inverter/transformer units and reduce the number of electrical inverter/transformer units from 27 no. to 14 no.; (vi) revise the alignment of approximately 250 metres of existing on-site access tracks and construct approximately 7,500 metres of access track; (vii) relocate and redesign the permitted battery energy storage system compound including an increase in the compound footprint from approximately 3,850 square metres to approximately 10,100 square metres; (viii) alter the design of the battery energy storage system and increase the number of battery energy storage system and ancillary containers from 38 no. to 83 no.; (ix) alter Condition No. 6(b) to provide for the planting of screening vegetation at the end of the construction phase; (x) alter Condition No. 5(a) to provide for the decommissioning of the development no later than 40-years from the date of commissioning; and, (xi) all associated site development, drainage, access and reinstatement works. This planning application is accompanied by a Natura Impact Statement (NIS)
A 10-YEAR PERMISSION. THE DEVELOPMENT WILL CONSIST OF THE CONSTRUCTION OF: 1. A SOLAR PV DEVELOPMENT ON A C.132 HA SITE CONSISTING OF SOLAR PANELS ON GROUND-MOUNTED FRAMES, 27 NO. SINGLE STOREY ELECTRICAL INVERTER/ TRANSFORMER UNITS, SECURITY FENCING, CCTV SYSTEM WITH POLE MOUNTED CAMERAS, UPGRADING OF EXISTING ACCESS, LANDSCAPING AND ALL ASSOCIATED ANCILLARY DEVELOPMENT WORKS; 2. AN ENCLOSED BATTERY ENERGY STORAGE SYSTEM COMPOUND ON A C.0.385 HA LOCATED WITHIN THE SOLAR PV DEVELOPMENT SITE CONSISTING OF 18 NO. BATTERY STORAGE UNITS (EACH WITH ASSOCIATED CONTAINERISED STEP UP TRANSFORMER), 1 NO. CONTAINERISED CONTROL ROOM AND 1 NO. CONTAINERISED SWITCH ROOM AND ALL ASSOCIATED ANCILLARY DEVELOPMENT WORKS; AND 3. A TEMPORARY CONSTRUCTION COMPOUND ADJACENT TO THE EXISTING ACCESS. THE OPERATIONAL LIFESPAN OF THE SOLAR PV DEVELOPMENT AND BATTERY ENERGY STORAGE SYSTEM WILL BE 35 YEARS. A NATURA IMPACT STATEMENT (NIS) WILL ACCOMPANY THE PLANNING APPLICATION
The brief summarizes the pattern across all 133 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 19186The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief