Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
15% of nearby decided applications were refused. The site check found 281 decisions within 5 km, 3 exact-site or onsite candidate records, and 18 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
18 structured nearby appeal records.
18 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
DEMOLITION AND RECONSTRITION OF PART-COMPLETED TWO-STOREY DWELILNG HOUSE ORIGINALLY PERMITTED UNDER PLAN REF 05/2032
DEMOLISH AND RECONSTRUCT OF A PART COMPLETED TWO-STOREY DWELLING HOUSE ORIGINALLY PERMITTED UNDER PLAN REF 05/2032. THE PROPOSAL INVOLVES THE CONSTRUCTION OF A DWELLING HOUSE, THE DETAILS OF SAID DWELLING HOUSE BEING THOSE ORIGINALLY PERMITTED. IT IS FURTHER PROPOSED TO CONNECT TO ALL EXISTING SERVICES WITHIN THE SCHEME, ALSO PERMITTED UNDER PLAN REF 05/2032
A 10-YEAR PERMISSION FOR DEVELOPMENT OF SKELLIG SIX 18 SPIRIT STORES. THE DEVELOPMENT WILL CONSIST OF INDUSTRIAL STRUCTURES ANCILLARY TO SKELLIG SIX 18 DISTILLERY (KCC REF 18/728); (A) DEMOLITION OF 3 EXISTING WAREHOUSES (B) CONSTRUCTION OF 6 NEW SPIRIT STORES, EACH WITH EXTERNAL YARD (C)CONSTRUCTION OF NEW DEMONSTRATION LABORATORY, CASKING SHED, BOTTLING SHED, GATE LODGE AND GATES (D) BRIDGE LINKING TO DISTILLERY (KCC REG NO. 18/728) OVER STRUCTURED WETLANDS (E) WATER STORAGE, FIREWATER PIT AND ANCILLARY INDUSTRICL INFRASTRUCTURE, SERVICES, FACILITIES AND UTILITES (F)REINSTATEMENT OF VEHICULAR ENTRANCE/EXIT ON ACCESS ROAD OFF N70 (G) SERVICE YARD AND STORAGE YARD WITH STAFF CAR AND BICYCLE PARKING (H) DARK-SKY RESERVE LIGHTING (I)BRAND, SAFETY AND WAY-FINDING SIGNAGE AND FLAGS (J) HARD AND SOF LANDSCAPING (K) GROUNDWORKS TO LEVEL SITE AND SECURE BOUNDARY WITH ADJACENT LANDS (L) PERMIETER SECURITY RAILINGS, FENCING AND PLANTING
CONSTRUCT AN EXTENSION TO THE GABLE END (NORTH FACING) AND FRONT PORCH EXTENSION AND THE PROPOSED CHANGE OF USE OF ATTIC TO STUDY
To A.) Construct extensions to the existing dwelling on the west and south B.) Make elevational changes to the existing dwelling C.) Decomission existing septic tank and install a septic tank and percolation area and all associated site works.
The construction of a men's shed (assembly building 234sq.m approx.) comprising of general purposes room, two meeting rooms, kitchen, office, keep fit room, sanitary facilities and car parking to serve the development
The brief summarizes the pattern across all 281 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 21605The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief