Applications tied to the site
Partial coverage6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 162 decisions within 5 km, 6 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Retention and completion of dwellinghouse under construction (permission previously granted Planning Ref. No. 05/2525) together with Permission to construct domestic garage, new entrance, proprietary treatment unit and polishing filter and all other ancillary site works
Permission for: a) retention and completion of partially constructed dwelling, b) proprietary treatment system and c) retention of mobile home (for temporary habitation).
Permission for retention for dormer style extension to side of existing dwelling as constructed, change to that permitted under Planning Reference 09/4162 to include change in roof profile and increased floor area and retaining existing porch, and all associated works.
Permission for the construction of new dwelling house and domestic garage, new entrance, waste water treatment system together with all other ancillary site works.
Construction of dwellinghouse, domestic garage, new entrance together with all other ancillary site works
To construct a dwellinghouse
The brief summarizes the pattern across all 162 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 19/5938The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief