Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
13% of nearby decided applications were refused. The site check found 387 decisions within 5 km, 2 exact-site or onsite candidate records, and 25 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched1 of 2 layers are loaded for Kildare County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedOne current citation from the Kildare County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Kildare County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
25 structured nearby appeal records.
25 matchedCitations are current-dated and carry policy name, section, page and source URL from the Kildare County Council development plan.
1 matchedOpen preview
Open preview
A change to the requirements of Condition 13 of Permission register ref. 05/300070, which requires that "The Creche shall be operational prior to the occupation of the 70th dwelling". Permission is now sought to amend that requirement to "The crèche shall be operational prior to the occupation of the 79th dwelling"
Retention to retain after school building, with independent relaxation room building as constructed to the side of existing playschool, all ancillary site works and services
Change of house type designs and layout for certain houses granted under permission register reference 05/300070, which was for construction of 100 houses and a crèche. It is proposed to change the houses on sites 2-13, 38-45 and 62-65 from Type E, 2- storey 3 bedroom terraced houses to modified Type E2, two – storey 3- bedroom terraced house type. It is also proposed to omit 8 houses on sites 50-57, currently Type D and E1, 2-storey 3- bedroom houses and replace them with 7 no. type A & A1 (mid terrace), 2 storey 3 bedroom houses in two blocks of 2 semi-detached and one block of 3 terraced houses and associated site works. No change to roads or services layouts. Overall reduction of one house in the full scheme.
1 single storey creche, 36 No. 2 storey 3/4 bed semi-detached houses Type A/B, 12 No. 2-storey 3 bed semi-detached houses Type C, 32 No. 2 storey 3 Bed townhouses in blocks
For to retain Staff Room unit as constructed to the front of existing childcare building, to retain 2 no. single storey prefabricated childcare classrooms as constructed to the rear of existing childcare building, all ancillary site works and services
Change of house type on site no. 34 from Type C, as granted by planning permission 05/300070, extended by register ref. 17-1013, to type E, a 2-storey, 3 bedroom, semi-detached house, including revised boundary outline
The brief summarizes the pattern across all 387 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 20973The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief