Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 675 decisions within 5 km, 4 exact-site or onsite candidate records, and 60 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
60 structured nearby appeal records.
60 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
RETENTION OF ESB SUB-STATION AS CONSTRUCTED AND ALTERATIONS TO SOUTH EAST ELEVATION, P14/492 & P05/3224 REFERS
CONSTRUCT EXTENSION TO EXISTING BUILDING (MCC PRINTING WORKS) ON SITES 21, 22 & 23 AND ASSOCIATED SITE WORKS (P14/492 REFERS). WORKS TO ENTAIL CONSTRUCTION OF AN EXTENSION TO THE EXISTING PRODUCTION FACILITIES WITH LOADING DOCK WITH A FIRST FLOOR AND MEZZANINE SECTION
RETENTION OF PART OF EXISTING FIRST FLOOR COMMERCIAL AREA. PERMISSION FOR CHANGE OF USE OF PART OF GROUND FLOOR AND ENTIRE FIRST FLOOR OF UNIT NO. 2 TO FITNESS GYM. NEW SIGNAGE TO FRONT OF BUILDING AND ALL ASSOCIATED SITE WORKS AND SERVICES
ERECT A PORTACABIN BUILDING FOR USE AS A CLASSROOM TO THE REAR OF THE EXISTING CRECHE INCLUDING ALL ANCILLARY SITE WORKS. PERMISSION IS ALSO SOUGHT FOR ELEVATIONAL CHANGE TO THE REAR OF THE EXISTING CRECHE TO CHANGE 2 EXISTING WINDOWS TO AN EXIT DOOR INCOPORATING AN ACCESSIBLE RAMP FOR ACCESS.
Planning Permission to retain portacabin building used as a classroom to the rear of the existing crèche as granted under P18/163 all as per drawing documentation submitted together with all ancillary site works and services
Amalgamate retail warehouse units 1-4 (3,228m2) permitted under P19/703 into a single unit for retail warehouse use and to extend the ground floor area to 3,770m2 (an increase of 542m2) and construct first floor mezzanine with a floor area of 395m2. The revised footprint is 3,770m2 with ESB substation, car parking and service compound. The application includes revised elevations, signage and ancillary site services
The brief summarizes the pattern across all 675 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 20619The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief