Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 123 decisions within 5 km, 2 exact-site or onsite candidate records, and 4 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
4 structured nearby appeal records.
4 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
RETAIN EXISTING TELECOMMUNICATIONS SUPPORT STRUCTURE (PREVIOUSLY GRANTED UNDER P05/3391) TOGETHER WITH ASSOCIATED GROUND EQUIPMENT WITHIN A FENCED COMPOUND
A 3 metre extension on top of an exisitng 30 metre lattice telecommunications support structure (previously granted permission under planning reference P21/1181) to give an overall structure height of 33 metres together with antennas, dishes, associated equipment, ground-based equipment cabinets and all associated site development works for high-speed wireless data and broadband services
CONSTRUCT A 3 BAY OPEN SLATTED SHED WITH A FEED PASSAGE AND UNDERGROUND SLURRY STORAGE TANK ALONG WITH ALL ASSOCIATED SITE WORKS
Upgrade of raw water pumps and controls, modification of underground tanks to provide a dedicated raw water tank, installation of equipment to improve process including a new flocculation tank, clarification tank, dissolved air flocculation. UV reactor dedicated chemical delivery area, and associated pumps, piping and valves and accessories. Construction of solids management consisting of tank for settlement and associated pumps and infrastructure. Installation of new concrete slab and installation of new sludge holding tank (45m3), settlement tank, sludge balancing tank, alum tank, DAF and all associated ancillary works and associated engineering works. Works also include the installation of pumps and pipework to the treated water storage tank including a scrubber within the Callow Water Reservoir site
CONSTRUCT DWELLING HOUSE, WITH PETU AND ALL ASSOCIATED SITE DEVELOPMENT WORKS ON FAMILY LANDS
CONSTRUCT A DWELLING HOUSE, WITH PETU AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
The brief summarizes the pattern across all 123 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 211181The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief