Applications tied to the site
Partial coverage10 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
10 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
3% of nearby decided applications were refused. The site check found 174 decisions within 5 km, 10 exact-site or onsite candidate records, and 2 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
10 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
10 matched1 of 2 layers are loaded for Cavan County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Cavan County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Cavan County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2 structured nearby appeal records.
2 matchedNo current-dated citation is loaded for Cavan County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
To complete façade works to existing industrial/ commercial unit previously approved under planning reference no. 05/717 together with extension to side and rear, provide 2 no. delivery/dispatch areas and associated site works
To retain internal alterations to ground floor layout of existing industrial building previously approved and constructed under planning reference 04/2564 together with retention for additional two floors above. Ground and first floor accommodation consists of office, canteen, locker room, laundry and toilets on each level, second floor incorporating plant room with alterations to elevations
For detached single storey building incorporating ESB plant rooms, switch room, boiler room, workshop and associated site works at
For alterations to existing industrial building including construction of two storey extension to northwest elevation incorporating loading bays on ground floor, staircore and offices on first floor, together with alterations to plans & elevations of previously approved extension granted under planning reference 21/303, connection to existing services and associated site works
For (a) alterations to previously approved extension granted under planning reference 20/409 which includes alterations to facades, extend access ramp position and gradient together with PLANNING PERMISSION for (b) lean-to extension to southeast side incorporating plant room and storage, (c) new loading bay to northwest side with roofed extension and (d) alterations to plans & elevations of existing industrial building and associated site works
(a) change of use of part of existing industrial unit to use as bakery (b) extension to northwest and northeast of existing industrial building incorporating associated storage (c) alterations to plans and elevations of existing industrial unit (d) ramp and retaining wall and associated site works
The brief summarizes the pattern across all 174 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2360111The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief