Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
14% of nearby decided applications were refused. The site check found 747 decisions within 5 km, 2 exact-site or onsite candidate records, and 52 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
52 structured nearby appeal records.
52 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The change of use of part of the premises (625sqm) at northern end of building, from its existing permitted use as a self-contained warehouse/distribution store with office accommodation as per planning ref. no. 06/1072 to brewery for the purpose of brewing local beers (under the Dead Centre Brewing logo) and associated steam extract system, storage area, dispatch area and staff welfare facilities
The development will consist of alterations, additions and demolitions to existing commercial unit to facilitate the development of a car showroom and workshop area to include new glazed frontage, cladding and signage and all associated siteworks and services including parking, boundary fencing, security and landscaping
Planning permission for a phased development (phases 1-3) to include: 1. Goods-in area including loading bays and new covered truck loading/unloading area, 2. High-bay storage facility and stock-transfer link to existing warehouse, and 3. Goods-out area including loading bays to the front of the existing warehouse, along with reconfiguration of traffic & parking facilities, together with associated demolition of plant rooms and unused detached office buildings, signage and all associated site works
Temporary 5 year permission for standalone single storey 3.5m high modular office building (floor area of 1800m2) with internal access road and all associated site works
Construction of a single-storey domestic garage and all associated site works
Retain the change of use of a former wholesalers/warehouse building to the use as a shop including ancillary staff offices and canteen, changes to the external finish of the building including new door openings to the North, South and East elevations, car parking and associated site works
The brief summarizes the pattern across all 747 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 215The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief