Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 1,495 decisions within 5 km, 3 exact-site or onsite candidate records, and 88 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
88 structured nearby appeal records.
88 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Retention to retain indefinitely the structure of the house (substructure, superstructure and roof) as is built and as was the subject of planning permission under ref no.06/1180 and also for planning permission to complete the building of this detached, two floored dormer type house, together with all associated site development works and all necessary installation of the services of on-site waste water (foul) disposal system and connection from the public mains water system
For amendment to planning permission Ref: 17/282 involving amendment to Conditions 1, 10(a) and 10 (b) to permit the permanent occupation of dwelling house by the applicants
For a single storey chalet type dwelling, hardcore area, driveway, connection to existing services and all associated site works
For development. The development will consist of a new 27 metres telecommunications support structure with headframe, carrying antennas, dishes, associated equipment, ground-based equipment cabinets, fencing and all associated site development works for high-speed wireless data and broadband services. The development will further consist of the construction of an access track
On 20/818
For the proposed erection of a fully serviced 2 storey detached dwelling, detached single storey garage, proposed vehicular and pedestrian entrance, boundary treatments, landscaping, together with all associated site development works to include new foul water treatment system and percolation area
The brief summarizes the pattern across all 1,495 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 17282The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief